Our first large-scale wind-smoothing installation was on Hampton Wind Farm near Sydney, Australia. There our containerized UltraBattery solution presented a smooth power signal to the grid from the variable output of the wind generators.

Read our case studies on:

Hampton Wind Farm NSW Australia

UltraBattery – the end of intermittency.